Construction on the front wall part of this project is done. I still need to prime the bare wood and install trim, but the hard work is finally done.

Roll up door removed and block wall complete. 
3 sheets of siding installed, new door framed and mounted. 
Old door removed, window framed and mounted.
Now lets look at what’s going on inside.

Inside kennels, also called their bedrooms 
Temporary tool and supplies storage 
Cleaning supplies and paint. 
Blankets, bath towels, cleaning rags and treats (top shelf) 
Temporary ICU 
Mop sink / bath tub 
Platform scale 
Portable Propane furnace 
The main space
There is a lot of work to do inside. But now it can be done in relative comfort, and our residents can stay warm and snug at night. that will be done easier once we get the insulation installed. That, and redoing the electrical wiring, are next.